Some time ago, we drilled an 800mm drinking water transport pipeline for Brabant Water. This was a rerouting required for the construction of a public transport bus lane in Eindhoven. We completed this project in collaboration with Hurkmans, who connected the drilling to the existing transport pipeline on both sides. Our 150-ton maxi rig operator will tell you more about this drilling.

https://youtu.be/nbOYONiuZBo