Holland Drilling

Expert in trenchless crossings

The specialist for the design and implementation of every trenchless crossing for underground infrastructure.

Quick links:

Holland Drilling

Renewal of the underground infrastructure

Technological developments are moving rapidly, requiring underground infrastructure to be modified or expanded more frequently. At the same time, time and space are increasingly scarce, with minimal disruption as a requirement. This calls for specialist work.

Holland Drilling

Connecting the underground infrastructure

Holland Drilling is the specialist for the design and implementation of various types of trenchless crossings. These include crossings with railways, waterways, and roads, where various cables, pipes, and conduits are installed:

Cables for solar and wind farms

Drinking and wastewater pipes

Gas and oil pipelines

Divers and casing pipes

Holland Drilling

Reliable and flexible full-service solutions

With our large team of interior and exterior specialists, we offer clients a full-service approach. As an independent drilling company, Holland Drilling focuses on craftsmanship, responsible work practices, and sustainable partnerships with clients, employees, and suppliers.

Versatile and innovative

Thanks to our flexibility, Holland Drilling can handle a wide range of projects. From drilling under driveways or in rock to auger drilling under railway lines and pipe bursting for replacing drinking water mains. Always with minimal disruption to the surrounding area.

Auger drilling Eugal pipelines

150 kV cable connection for BP

Holland Drilling

Communication and security throughout Europe

Our team consists of enthusiastic and dedicated professionals. They design and execute all drilling and pressing operations based on the customer’s requirements. At Holland Drilling, good communication, safe working practices, and quality are paramount.

Diameters up to:
32 mm
Diameters up to:
0 m

Projects throughout

Europe

Safe, ergonomic and sustainable machinery

With our modern and extensive fleet of machinery, we can complete a wide range of projects. With every new investment, we pay close attention to safety, ergonomics, and emissions. Much of our equipment is developed in-house or custom-built specifically for us.

  • 8 HDD drilling rigs from 2.5 to 150 tons of pulling force
  • 5 pilot-controlled auger drilling rigs up to 320 tons
  • Fully equipped drilling truck for steel pressing
  • Pipe bursting machine
  • 4 vacuum tank trucks
  • 7 trucks
  • 4 low loaders
  • 8 excavators
  • Related equipment:
    • Tubular roller sets & pipe cradles
    • Trench formwork
    • Vibratory block & steel sheet pile
    • In-house developed equipment
Holland drilling

Certifications and safety

Our certifications

Our accreditations