HDD Drilling for Brabant Water (Eindhoven)
We recently installed a drinking water transmission pipeline for Brabant Water in an urban area of
Welcome to Holland Drilling
Holland Drilling is the specialist in designing and constructing trenchless crossings for underground infrastructure.

We recently installed a drinking water transmission pipeline for Brabant Water in an urban area of

Autobahn A6 In spring 2017, Holland Drilling performed an HDD drilling operation under the Autobahn A6

Grid operator Tennet engaged Joulz to design and implement a 150kV connection for a BP refinery

ProRail is currently working on an impressive transformation of the Driebergen – Zeist station area. Before

For client Fluxys, A. Hak Leidingbouw constructed a 36″ high-pressure gas pipeline near Lichtervelde close to

In early 2020, Holland Drilling carried out a pilot-guided auger drilling project in Badhoevedorp. This involved

In 2019, Holland Drilling carried out auger drilling on several sections of the 56″ (1,420 mm

How do you install a 25 kV cable connection and gas pipeline in a protected nature

In mid-2018, Holland Drilling installed a drinking water pipeline on the island of Cyprus. To guarantee