Pilot-guided Auger Drilling

In early 2020, Holland Drilling carried out a pilot-guided auger drilling project in Badhoevedorp. This involved a 69-meter long bore for the installation of a drinking water transmission pipeline, in which an Amiblu pipe with a diameter of 820 mm was installed.

Due to the nearby body of water, the drilling was performed from a closed sheet pile pit.

For this drilling, the 320-ton pilot-guided auger drilling machine was deployed.