Blog

Day: September 10, 2025

Project

HDD – Drilling 20″ Steel

Autobahn A6 In spring 2017, Holland Drilling performed an HDD drilling operation under the Autobahn A6 in Heilbronn, Germany. The Autobahn A6 was being modified,

Project

Boring Station Driebergen

ProRail is currently working on an impressive transformation of the Driebergen – Zeist station area. Before construction work could begin, several cables and pipelines had

Project

36″ High-pressure Gas Pipeline

For client Fluxys, A. Hak Leidingbouw constructed a 36″ high-pressure gas pipeline near Lichtervelde close to the Belgian coast. Part of the project involved eight

Project

Pilot-guided Auger Drilling

In early 2020, Holland Drilling carried out a pilot-guided auger drilling project in Badhoevedorp. This involved a 69-meter long bore for the installation of a

Project

Auger drilling Eugal pipelines

In 2019, Holland Drilling carried out auger drilling on several sections of the 56″ (1,420 mm diameter) Eugal pipeline. The Eugal pipeline is a gas